Upper Floor Renovation

Currently we are renovating the upper floor with the cherry board wall panels and wall lights. It’s about 70% complete. The second stage would be removing the toilets from upstairs and relocating them down to the back of the kitchen. Then more decor will be designed and installed on upper floor. All projects are scheduled to be completed by the end of 2006.

Leave a Reply

Your email address will not be published. Required fields are marked *